Nerathong Bridge Replacement
Replacement of a 60-year-old, 5 span concrete Structure, over the Nerathong Creek, south of Condobolin, NSW and concurrently develop a procurement strategy for the replacement structure.
This project will be delivered in alignment with the below, staged delivery approach:
• Investigate bridge replacement options for the replacement of Nerathong Bridge.
• Procure design & specialist consultation services for the detailed design of a replacement structure, followed by the procurement of construction services for the identified solution.
• Project Management of the construction phase, followed by project closeout and handover.